Features

Whatever your role is or whatever your need is, a set of business features are available

Choose a role

or

Choose a goal
Build Estimate filter

Build
the Cost Estimate

Consolidated Offer filter

Derive
the Offer

Analyse Data filter

Analyse
data

Competitiveness filter

Process
Improvement

Improve Process filter

Gain
a competitive edge

Build
the Cost Estimate

Derive
the Offer

Analyse
data

Process
Improvement

Gain
a competitive edge

A Wizard to create the Costs WBS

Build and easily change the Costs Work Breakdown Structure (WBS)

The WBS Wizard enables the user to select the required WBS level for the item to be entered, and automatically maintains the consistency of the tree structure.

Incorporate Cost Estimates from a variety of sources

Use the WBS Wizard to integrate existing Standard Costs data and cost estimates from the Item database, reference quotes or other DeviProp projects.

Structured and secure Data Entry

Managing economic data

The input of different types of cost attributes (for example currencies, cost centres codes, travel expense codes, etc.) is facilitated by selecting the relevant options from pre-defined menus.

This reference data is managed centrally by an administrator, leaving the user to focus on accurate and consistent data entry for each project.

Easier data entry using Inheritance

Entering data at detailed levels of the Costs WBS is faster and more reliable due to the automatic inheritance of attributes (for example currency or cost centre codes) from the higher level, unless otherwise specified by the user.

Advanced Data Entry Capabilities

In addition to being able to directly enter a numeric/text value for a cost item, other more sophisticated methods are available:

Clearly Identified Cost Elements

Each cost element such as “Miscellaneous Allowances”, “Guarantees”, “Risks” or “Contingencies” has a dedicated column to enable the entry of absolute or percentage values.

Integrated Scheduling Functionality

Integrated Scheduling Functionality

Valid Cost Estimate with supporting Schedule

DeviProp provides everything to rapidly derive an appropriate GANTT chart for the project, providing the basis for further refinement to calculate the effects over time of inflation/deflation on costs and prices, and determine cash flow forecasts and payment schedules.

Simplified "Top-Down" Scheduling Approach

Producing a complete project schedule is easily achieved by modifying timescales at the highest levels of the WBS, avoiding the need to plan at more detailed levels.

Provides all necessary Scheduling concepts and techniques

DeviProp provides a variety of techniques for project scheduling: